The mission of Scitopia Chicago is teen self-realization in science through innovative hands-on learning & community revitalization inspired by a free, resource-rich public destination.

Meet Scitopia Chicago
apb: Architecture for Public Benefit
Whitten-Newman Foundation
City of Chicago

AIMS

Learning in Community

Scitopia Chicago overarching model is “learning in community” manifested foremost by its location in the heart of Washington Park, a storied, revitalizing southside neighborhood. Location, central to urban equity, lies at the base of a learning pyramid, its apex composed of individuals, none more central than teens self-realizing their future.

Pyramid of Chicago Scitopia aims.
EcoLab teens wade in to investigate the health of Washington Park’s lagoon. EcoLab teens wade in to investigate the health of Washington Park’s lagoon.

STEM Redux

Scitopia Chicago redefines “STEM for the 21st Century,” replacing the emphasis on applied science and math with hands-on learning, environment and climate, and today's media landscape. Basic math and writing are foundational and mentored.

STEM for the 21st Century

Audiences

TEENS

Self-realization makerlabs, hangout space, library resources, and mentoring for southside teens to ensure graduation, internships and career pathways

ADULTS

Learning and meeting, lectures, library and horticulture resources, neighborhood history, engaging aspiring teens, and a free, relaxing destination

CITY

Anchor for neighborhood corridor revitalization, school and teacher resource, public library/park district/university connection, unique event space and southwest side destination

NATION

National model for equitable neighborhood-university-city collaboration, ground-breaking zero-energy greenspace and free, iconic public destination

DESIGN

LAYOUT & FUNCTION

Scitopia Chicago aims to be the first carbon-neutral, net-zero-energy (LEED Platinum) public science destination in the world by employing renewable cross-laminated timber and advanced smart glass and by harnessing geothermal and solar energy.

The ground floor includes Visions, an exhibition and event space showcasing the neighborhood’s 1950s jazz scene and the ecological diversity of its landscaped park, the Lost World’s unique Africa- themed museum-conservatory-vivarium, and the Golden Lily Café, a place to relax, connect or seek library resources. Teens have access to the Imaginarium’s work and hangout areas and project resources.

The second floor includes the MakerPlace, an event and performance space that allows observation of hands-on learning in MakerLabs, a Solarium to engage horticulture activities, and access to the canopy views of the Lost World Skyway.

MakerLabs
Four small-group labs for hands-on programs spanning the sciences and media.
MakerPlace
A flexible event and performance space at the center of the second floor.
Lost World
Conservatory-vivarium-museum connecting West Africa’s living biota with its deep past.
Solarium
Sun-soaked greenspace for horticulture programs.
Visions
Neighborhood exhibition space also available for lectures or meetings.
Imaginarium
Teen dream space to meet, connect, plan, work or just hangout and snack.
Golden Lily Cafe
Like its neighborhood namesake, a welcoming community-run venue for connecting and reflecting.
Design and architecture by Architecture For Public Benefit.

LOCATION

Scitopia Chicago lies within a transit corridor including two CTA rail lines, an expressway, major avenues and a boulevard corridor.

Scitopia Chicago will begin to balance Chicago’s long-standing lakefront museums and institutions.

Scitopia Chicago, located in the heart of the Washington Park neighborhood, lies at the center of one of Chicago’s envisioned transit hubs (eTOD), with some five million passengers passing by annually along Garfield Boulevard or the CTA’s Green Line.

TIMELINE

Project timeline graph

SCITOPIA FOUNDATION

BOARD OF DIRECTORS

Paul Sereno Professor, UChicago
Cecilia Butler President, Washington Park Residents’ Advocacy Council
Ken Polonsky Professor, Physician, UChicago, Sr. Advisor to the President
Rev. Jesse Knox III Senior Minister, Church of the Good Shepherd
Rich Crowley President, Chicago Herpetological Society
Eric Klinenberg Author & Professor, New York University
Fabiola Delgado Chief of Staff, UChicago Natl. Laboratories & Asst. VP for Finance
Jessica Roeder Project Manager, Fossil Lab at UChicago

ADVISORS TO THE BOARD

Sophia Carey Founder & CEO, BuildWise LLC
Jeremy Dunn Manager of Digital Inclusion, Chicago Housing Authority
Tim Knowles President, Carnegie Foundation for the Advancement of Teaching
Walter Massey Senior Advisor to the President, UChicago
Lisa Roberts Founder & Principal, naturalia, inc.
David Wilts Founder & CEO, Digital Masterplanning LLC
TODO

CONTACT US

We'll never share your email with anyone else.

You can e-mail the Scitopia Foundation at info@scitopiachicago.org.